Thursday, August 23, 2007

StreamLine Timberworks



While there is pounding, digging, sawing, pouring, and all kinds of things going on in Hardyville, there's a team working hard on the project in Richmond and Floyd, Virginia. We selected SLTW several months ago to be our timberframe supplier. They took our initial plans and through hours of design work they have developed a layout and design that will WOW those guys going up and down the river. We're really excited with their work and can hardly wait for the raising.

In this photo above in Richmond; Mark Adams, the"Sales Guy" and Isaac Fleming, the "Project Guy" look over plans with George, the "Check Guy".
In Floyd, Virginia; Jessie Parrish, the "Design Gal" and Steve Arthur, the "Design Guy" create the "Coastal" timber frame. It's going to be SUPER!









Saturday, August 18, 2007

Let's take a Break


What a week!


Between Saturday Aug 11th to Friday Aug 17th:

Took off old roof and Bathroom

Put on new Roof

Enclosed and waterproofed new roof

Closed an old well

Dug footers

Poured footers

Removed a big stump and an old foundation


Time for three Soda Pops and one Brown Kool-Aid

Pouring the Footer




Friday Aug 17th


The footer is poured by Jeff Sterne and Company

Weather Proofing



Wed. Aug 15


Temporary roof ends are put in place and then roof wrap. All this to keep out a hurricane.

Removing a couple of Minor Obstacles



Wed. August 15th


A stump and an old foundation are eliminated.

Digging the Footer




Tuesday the 14th


Jeff Sterne starts digging the footer.

Following the State guidlines for Closing a Well




Tuesday Aug. 14th


We pour 9 Cubic Yards (the whole nine yards) of perfectly good concrete down our old well (which we did not know we had) and now the well is Offically Abandoned.






Building Back Up


Monday 08/13 Eddie, Richard, and Tommy begin

Thursday, August 16, 2007

24 hours later


No roof, no bathroom.


Noth'in does it like a CHEVY Truck!!


Supervision is Plentiful



Sunday

Going, Going, GONE


Saturday August 11, 2007


Jeremy, Armando, and Helper begin the demolition.

Going, Going, GONE


Jeremy's Crew - roof ALMOST Gone

Going, Going, GONE


Sunday 08/12 Roof almost off

The new well goes in.


August 2, 2007,


A 110 foot pipe with pump attached is lowered into the well by Gary Blake and helper.

Water quality excent. Clearity - excellent.

Wednesday, August 8, 2007

All the Comforts of a Cottage



August 7, 2007


Well, it arrived just in time. A "Trudy" porta potty.


This thing has a sink, a light, and everything else. Our HVAC expert and friend Lewis hooked up our 2.5 ton heat pump to the potty and man o man does it cool it down. Actually, it's a little over sized in the event we want to add a second floor.